SaaS Staging Server Refresh

SaaS Server Refresh 

Description:

The work is to replace all data (database, data and application files) on  Staging server with data taken from Production (Live) server

Pre-conditions:

Agreement from the client that the staging content and version will be replaced by the Live content and version.

Available disk space.

Estimate:

Best case: 1 hr

Usual case: 4 hr

Worst case: Depending on constraints

Constraints:

Amount of data to be copied over.

Acceptance criteria:

Staging site in the same state as Production from the point of data transfer.

Downtime:

None for Live

Resources required:

PM, Support Engineer

Created on 26 May 2018 by Stas Dreiling