SaaS Server Refresh
|
Description: |
The work is to replace all data (database, data and application files) on Staging server with data taken from Production (Live) server |
|
Pre-conditions: |
Agreement from the client that the staging content and version will be replaced by the Live content and version. Available disk space. |
|
Estimate: |
Best case: 1 hr Usual case: 4 hr Worst case: Depending on constraints |
|
Constraints: |
Amount of data to be copied over. |
|
Acceptance criteria: |
Staging site in the same state as Production from the point of data transfer. |
|
Downtime: |
None for Live |
|
Resources required: |
PM, Support Engineer |